Tower Crane Dismantling Method Statement
Have a specific crane model or site constraint? Drop a comment below or consult a CPCS/NCCCO certified lifting engineer.
Tower Crane Dismantling Method Statement is a critical safety document that outlines the step-by-step procedure for decommissioning a tower crane. It ensures that the sequence follows manufacturer guidelines to maintain structural balance and worker safety. 1. Preliminary Preparations tower crane dismantling method statement
A mobile or crawler crane with sufficient capacity and boom length to reach the tower crane’s highest point. Rigging Gear: Have a specific crane model or site constraint
Dismantling must be suspended if wind speeds exceed the manufacturer’s limits (typically 38–45 mph). tower crane dismantling method statement